20+ hrs of work and this is where we're at. Seems to be a slow process but now the main chassis is ready to be welded and then I hope we can move on to back half. A lot of tubes are still missing as I want to build the floor to SFI 25.4 specs but they will be added after the body is off.
|
The framehead is only used as a jig to locate front axle. It will be removed. |
|
Any takers? |
Ei kommentteja:
Lähetä kommentti