sunnuntai 15. huhtikuuta 2012

Trial fitting

we decided to trial fit the header before going any further with the welds. Only minor adjustments were needed to get all lined up. Looks good so far.


keskiviikko 11. huhtikuuta 2012

And pipe work continues...

torstai 5. huhtikuuta 2012

Things are getting along nicely. Manne has been welding the pipes and cyl 1 and 2 are now ready to be tested on the engine. Amazing welds, just wish I could do the same.


sunnuntai 1. huhtikuuta 2012

Begun cutting the bends and pipes for the header. Slow process but it's getting there.
Easier and much more precise cuts than with an angle grinder.
Cyl no 2 tubes ready

torstai 9. helmikuuta 2012

Header plans

Manne sent me first cad pics of the header. Looks like it can be done using standard bends. All the pipes are same length and size and hopefully there will be enough ground clearance. Lowest point is 15cm from the ground.

Cylinder no. 1 still needs work but otherwise this is the plan.

sunnuntai 29. tammikuuta 2012

I installed screws to keep crankshaft oil seal in it's place. I've never blown a seal before but last summer it blew off three times and replacing it is quite a job. I'm also improving breathing a lot and probably it alone will prevent the seal moving but I can never be sure.
Simple fix and I hope it works.

keskiviikko 18. tammikuuta 2012

Dash is on

I'm not very fond of electrics and that's why I didn't insall the dash earlier. I finally got myself to do it and it was fairly simple, only 7 wires to be connected as I'm getting all the data from ECU. For the ECU I need to install road speed sensor, clutch shaft rpm sensor, oil and fuel pressure sensors and that's about it for now. However, the dash looks OK and I can configure it as I like.